Drive the heads flush with the wood but don t allow them to penetrate.
Attaching cedar siding.
Cedar siding should be securely nailed to framing members.
It is best that the siding slats be kept six to 12 inches off the ground so that the exposure to water is limited.
Also placing spacers between the slats will help to ensure a straight piece of siding.
Go back and nail subsequent nails along the top edge of this cedar shake siding piece.
The fastest and most thorough method to apply stain to cedar siding is with a thick natural bristle brush.
Use two nails per shingle.
Installing cedar siding planks requires at least three workers.
Wall construction like all siding materials western red cedar performs best when installed properly on a suitable frame.
For cedar siding over wood sheathing nailed at studs for application over foam sheathing add the thickness of the foam to the tabulated nail length.
Cedar is a material that needs to be allowed to flex once installed.
Step 4 choices of design.
We see a lot of people installing their wood siding all the way to the ground.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Use an air nailer if possible to speed nailing and minimize damage to siding surface from hammer dents.
Let cedar siding flex and breathe.
It is important to keep siding at least 18 inches off the ground if possible.
Splash back water damage.
Using the nail gun drive a single nail at one end of a cedar shake piece of siding and then carefully align it along the snap line attaching another nail at the opposite end.
This is particularly important for vertical installation.
When you come to the last space in a row use a utility knife to cut a shingle to fit into it.
This will guard against splash back rain water hitting the ground and splashing back against the siding which can cause a finish failure.