It covers safety and preparation.
Attic drywall installation.
Part 2 covers applying and repairing.
When the small piece is in place install the longer piece.
Drywall often called gypsum wallboard gyp board or plasterboard is made of a crumbly fire resistant substance called gypsum.
The first layer should have the facing against the drywall to act as a vapor barrier.
Drywall installation labor basic basic labor to install drywall with favorable site conditions.
Position the piece lift it with a drywall lift and screw it in place.
First check for head clearance.
This is the first article in a two part series on installing drywall in an attic.
In most cases you ll need to drill a pilot hole and install a hex head cap screw and lock nut to keep the foot in place.
Make sure the foot pads touch the floor and provide a stable even surface for you to step on.
Install drywall to reach the floor and frame outside corners begin the bottom row with a shorter piece so that the seam in the top row will not be directly above the seam in the bottom row.
Milwaukee wi 53215 date.
4 x 8 sheets.
Building codes vary by location but most require at least a 7 foot clearance for attic expansions.
You should install two layers of insulation in your attic.
Install the attic ladder feet as instructed by the manufacturer.
That s measured after you finish the ceiling.
If you don t have enough height you ll have to raise the roof line and that adds a lot to your construction costs.
The first layer will sit between the joists and the second layer will run perpendicular over the joists.
Paper faced 1 2 thick gypsum board.
Quantity includes typical waste overage material for repair and local delivery.
Unfinished attic the need s installation and flooring and drywall.