For a typical commercial flooring installation banks offices schools shopping malls etc this amount can be as much as five to ten percent of the total material required for a job.
Attic stock requirements.
Services h1 h10 a.
How much attic stock is recommended.
Upon job completion this excess material is either delivered to the customer or safely stored for a period of time in the contractor s warehouse.
Contractors tend to leave behind construction excess in mechanical rooms causing a safety hazard.
This strategic assessment was included in the 2016 2017 annual audit plan.
Attic stock additional material requested by the project leader shall be coordinated through opp stores at university park or the maintenance supervisors at commonwealth campus locations.
Five percent of the total square feet installed is a reasonable attic stock if preparing for minor accidents.
Those customers who purchase attic stock for specific anticipated replacements or expansions should purchase a quantity specific to the target areas.
Clause f6 attic stock and spare partswhen building attic stock and or spare parts requirements are specified in the contract documents the contractor shall 1 comply with such requirements and 2 ensure that subcontractors comply with such requirements.
These items typically cost.
Items not inventoried in this manner will not be accepted and an appropriate credit shall be provided to the owner.
Shall maintain a reasonable attic stock of removed ca rpet to make any necessary repairs and will make all efforts to match the carpet color with said attic stock but will not be required to match the color if such stock does not exist.
Plumbing and sewage systems e.
In most cases the attic stock requirements for these materials all finish and material items such as paint flooring wall covering or other items that require specific color or pattern match shall be no more than 5 of what was necessary for actual use upon being placed in service.
Maintenance attic stock completed on projects from the contractor to the district s maintenance department.
Electricity and fuels f.
We did not consider scrap or waste materials to be excess materials for purposes of this review.
There is no process in place for verifying that the specified items have been received.
Attic stock at project occupancy the lessor shall provide the lessee the following materials and quantities as attic or replacement stock.